Sunday, November 25, 2007

Changi Airport Terminal 3 opening 9th January 2008

Yesterday, I visited the new Changi Airport terminal 3 ( it would be officially open and operating on 9th January 2008). It is so big and we walked so much and we were so tired.

Our existing Changi Aiport Terminal 1 and 2 are already very good and now with terminal 3 , we really are very spoilt with good shopping, dining and travelling facilities....lol. It really looked like a big shopping Mall with 140 retail shops and F&B outlets with the most desired lifestyle brands and well loved dining establishments.

This is the only one portion of the departure hall, it is actually very very big.

Viewing the interior of transit area from the main hall. Majority of the walls are made of glass. So we can view the interior of the transist area from the departure and arrival hall and vice versa.
From the main hall, one can even view the immigration hall, where arriving passengers queue to get their passport stamped.

Testing luggage bags all ready for the testing before the new terminal 3 open.

For more photos: Click here

3 comments:

P.N. Subramanian said...

Changhi Air Port is incredible. Its huge and very clean. Thanks.

Unknown said...

Nice Post. In Addition, if you ever need Limo Services that would make your travel safe and secure. Maxi Cab Limo Services is one of the biggest networking fleet of luxury cars.

Unknown said...
This comment has been removed by a blog administrator.